AUXITEC TÉCNICA Y CONTROL S.A.
SYSTEM ENGINEERING FOR RAILWAY INFRASTRUCTURE


Choose your Language:



Subway Main References

- Detailed Design for the execution of the works for the renovation of the signaling system and Automatic Train Protection (ATP) of the Valencia sections of lines 1 and 2 of the Valencia Metro network of FGV. 2022, Spain

- Development of a new Intelligent  evacuation System trough a dynamic light guide that can analyze peoples flows (GLISS), on-going, Spain

Technical assistance for Works Management of Light Metro in Granada. Section length: 15.990 metres. Stations: 27. Speed of line:  70 km/h (in service), 2012, Spain

Technical Support for elaboration, management and supervision of documentation project: "Installation of Automatic Train Operation System (ATO). Lines 1, 3 and 5 Metro of Valencia" Length of the metro line in general: 156,388 kilometers Nº Stations Line 1 - 40; Line 3 - 27; Line 5 - 18 Speed of the metro line: 80 km/h, 2008, Spain