AUXITEC TÉCNICA Y CONTROL S.A.
SYSTEM ENGINEERING FOR RAILWAY INFRASTRUCTURE

Choose your Language:



Conventional Rail Main References (last 5 years)

- Detailed Design and Execution of the works corresponding to the GSM-R Mobile Communications System in the Aranjuez - Atocha - Chamartin - Villalba section. Line C3 Cercanias de Madrid. Lenght: 75,3 km; Speed range (50-200 km/h), 2020, Spain

- Detailed Design and Execution of works for the supply and installation of the necessary equipment for the emission of the new ASFA Digital frequencies of the stop pre-announcement, caution announcement and stop limit zone control aspects. LOT 1, 2 & 3, 2020, Spain

Transition to a new energy supply system throughout Boyuk Kasik corridor, renewal of the signboard system and Consulting Services regarding to procurement of electrical locomotives. Line length: 500 kilometers, 2019, Azerbaijan

- Detailed Design for the installation of an electronic interlocking and track circuits upgrade in Montcada Junction station, 2019, Spain

Drafting of the project and execution of works: Installation of electronic interlockings at Tortosa and Campredó stations. Tortosa- L'Aldea-Amposta line, 2018, Spain

Independent Acreditation Assessment of the track circuit of Thales (new product of TTC), 2017 Spain